Last week, when no one could find the sewer lateral to connect the GreenBuild plumbing to the main, Envinity called a company from Pittsburgh called Miller Pipetech who uses something called a lateral launch camera. They sent the camera into the sewer to find the lateral. Check out the footage, and a map of the results!
0 Comments
All of the first story framing happened in one day. The two story sections are where the stairs will be. The framing in those sections spans two stories to eliminate any hinge points between floors.
All renderings are subject to change, and will change as this project evolves.
GreenBuild site manager Chris, and employee Zack, show how the foundation is insulated for frost protection before rough sewer plumbing is installed. The next step will be to backfill with stone, and install sub slab insulation and a vapor barrier. By the end of next week the site will be rough graded, the excavator will be gone, and this will look more like a future home! Permits are almost signed and heavy equipment will soon be on site. Here is 1394 University Drive before any digging and site work. |
Categories
All
GreenBuild Headlines |